Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

October 25, 2023

Multiple Locations

Renovation

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Chey Mtn AFB, CO

Our team is requesting plans for this project.

Subscribe to View Full Documents

Amendment 1 8/16/2023- Amendment will updated site visit date to Monday 21 August 2023 at 0900. Convert existing preaction fire sprinkler systems (X2) in buildings 12110 and 12111 to wet fire sprinkler systems. The work to be performed shall consist of furnishing necessary labor, tools, transportation, supplies, equipment, materials, and incidentals necessary to complete all work stated in this Statement of Work (SOW). The Contractor shall follow all current, applicable codes (NFPA 13-2019), regulations, standards, and criteria. In addition, all work procedures and materials shall be approved by the 21st Civil Engineering Squadron (21st CES) prior to the start of work. The work in this SOW shall be executed by qualified and efficient mechanics/tradesmen, skilled in their respective trades. The contractor shall coordinate and perform all operations in a manner that will result in a professionally and expeditiously completed project. PROJECT DESCRIPTION *Provide current NFPA-13 and UFC 3-600-01 submittals, material, and implementation to remove the existing 11/2" preaction valve for both buildings and install wet risers with flow switches. *Run the system drains to the exterior similar to the existing drains. *New wet risers to be hydro-statically tested at normal working pressure. *Exercise the flow switches and supervisory switches to verify operation.*Existing core/shell piping to remain in place at current elevation with nomodifications. *Supply escorts while in facility. For further details, refer to the Statement of Work document attached to this request.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects