Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 10, 2023

April 1, 2024

Urick St & Olive Ave

New Construction, Site Work

No Information to Display

$5,000,000.00

Public - County

img_map_placeholder

Urick St & Olive Ave, Fruitland Park, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Project consists of the new construction of an elementary school on a 19-acre wooded site. Work includes a new one story and two-story building. First floor is approximately 72,000 square feet and second floor is approximately 27,200 square feet. Pre-qualified subs are requested for the civil-site work, and major long-lead mechanical and electrical equipment. Site work includes site clearing, earthwork, grading, storm drainage, concrete curbing, asphalt paving, concrete paving, stabilized paving, site fire and domestic water utilities, sanitary utility systems, sanitary lift station, grease trap structures, parking lot and drive lane stripes/markings and regulatory signage work. Long lead items include: chillers, air-handlers, pumps, diesel generator, switchgear and associated equipment. DACG requests RFIs by email only to cmullins@dacginc.com. NO PHONE CALLS requested. *Do NOT call the Owner or Architect for any reason. PLEASE NOTE: Bulletin A dated 8-21-23 has been released.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.