Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 3, 2023

October 3, 2023

No Information to Display

Roaring Run Rd

Paving, Site Work

No Information to Display

$164,000.00

Public - City

img_map_placeholder

Roaring Run Rd, Eagle Rock, VA

Subscribe to View Full Documents

1.0 Scope of Work Provide a brief statement of the overall project, including goals and objectives. This project will replace the failing timber superstructure for the Roaring Run Road Bridge (FSR 740 MP 0.169) with a concrete cored slab, as well as update the bridge railing and add approach guardrail on each side. The work also includes installing a sleeper slab on each bridge approach and also asphalt pavement for the wearing surface. 2.0 Background Provide a general description of the requirement, describing the acquisition history (if applicable), the current environment, and the vision of the future of the requirement. If information technology is a factor, provide pertinent technical facts. The existing 740-0.169 Roaring Run bridge structure uses a nail-laminated timber superstructure which has been identified in recent bridge inspections as rotting on the edges due to a constant presence of moisture. Inspections have identified the need for replacement of the bridge superstructure. The existing concrete abutments are sound and in acceptable condition. As a result, these abutments will remain in place and be used with the new concrete superstructure. Bridge railing does not meet current standards and so will be upgraded. In addition, bridge approach railing will be added to meet current standards for the maintenance level of the road. Adding sleeper slabs at the approaches and asphalt paving for a wearing course will protect this bridge superstructure from wear and excessive deterioration from gravel, thereby lengthening the life of the overall bridge structure and reducing annual maintenance.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.