Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

March 29, 2024

January 30, 2024

Bear Valley Rd

Paving, Site Work

No Information to Display

$25,000.00

Public - County

img_map_placeholder

Bear Valley Rd, Hegins, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of September 19, 2023, no bids received. No definite date for the rebid. Bid results will be available either as requested or electronically. The Work related to the Bear Valley Bridge Rehabilitation Project comprises rehabilitation of the existing concrete deck bridge and steel substructure, stabilization of the surrounding area, workmanship and all appurtenances for a complete job. The Bid shall be accompanied by a Bid Bond in the amount of 10 percent of the total bid price, payable to Hegins Township, as a guarantee that the Bidder, if its Bid is accepted, will promptly obtain the required Bonds and Insurance, prepare the required submittal documents and execute the Agreement. All Bids shall remain irrevocable for a period of 60 calendar days from the date of Bid opening. The successful Bidder will be required to post a Performance Bond and Payment Bond in the amount of the Bid price. Bids shall be submitted upon forms furnished by Hegins Township. Contract Documents may also be obtained electronically. Pennsylvania Prevailing Wage Rates will apply to the project. Hegins Township reserves the right after opening bids or reject any part of or all bids and to waive any minor informality, technical defects or irregularities in a bid Clarification Deadline: 8/27/2023 9:00 AM The Work to be constructed hereunder is located on Bear Valley Road in Hegins Township, County of Schuylkill, Commonwealth of Pennsylvania. The bridge crosses over the West Branch Rausch Creek, west of Gap Street. The work to be completed includes structural upgrades to the existing Bear Valley Bridge west, underside of bridge and stabilization of the existing stream bed and embankment

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects