Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 12, 2024

No Information to Display

W Union Ave

Paving, Site Work

No Information to Display

$437,948.00

Public - City

img_map_placeholder

W Union Ave, Englewood, CO

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference Number 0000327753 Question Deadline 08/30/2023 at 2:00 PM MT Questions are submitted online No The City of Englewood’s objective is to hire a qualified and competent Contractor to provide all labor, materials, traffic control, and equipment necessary to construct the Sidewalk and Ramp Gap Design and other improvements as detailed in the attached drawings and specifications included as part of this Invitation to Bid. General Scope of Work Description The work to be performed under this contract for Sidewalk and Ramp Gap Construction includes the addition of approximately 750 linear feet of 6” sidewalk to connect the existing gap in sidewalk on the north side of W. Union Avenue, west of S. Santa Fe Drive, to the access for Creekside Experience Park, which is referred to as Package 1. Package 1 will also include repairing deteriorated drivecuts along W. Union Avenue, the relocation of a fire hydrant, construction of 6” to 2’ retaining walls to accommodate the newly constructed sidewalk, and construction of an ADA ramp. Package 2, which includes the addition of approximately 500 linear feet of 6” sidewalk to connect the sidewalk access at the Little Dry Creek Trail to the parking lot at W. Floyd Avenue and S. Inca Street. Package 2 will also include the construction of an ADA ramp. Mobilization, construction surveying, and traffic control shall also be provided by The Contractor for the project.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.