Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

September 28, 2024

3350 N Martin Luther King Jr Blvd

Renovation

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

3350 N Martin Luther King Jr Blvd, Lansing, MI

Subscribe to View Full Documents

Renovation of existing lab storage space into a new BSL-3 lab. Work includes demolition of existing walls, new walls, mechanical, plumbing, power, lighting, and lab equipment. Each Bid shall enclose Bid Security, as specified in Section 00100 Instructions to Bidders (and as specified in Section 00310 Bid Bond, if a Bid Bond is enclosed), in the amount of five percent (5%) of the Bidder's Base Bid. If Bid Security is by check or money order, such certified or cashier's check or money order must be delivered in original copy before the Bid Due Time to: State Facilities Administration Design & Construction Division 3111 W. St. Joseph Street Lansing, Michigan 48917 Please do not submit online questions via electronically. ALL questions should be emailed to Nathan Hebekeuser at hebekeuser@mayottearchitects.com no later than 2:00 p.m., Eastern on 8/23/2023. NIGP CODES: 90924, 90977, 91065, 91075, 91200, 91438, 91450, 91468 The State reserves the right to cancel this Invitation to Bid (ITB) or change the date and time for submitting Bids by announcing same at any time before the established date and time for Bid opening. Bids must remain open for acceptance by the Owner for no less than the Bid hold period. Contractor may agree to extend the Bid hold period. However, any such extension must be based upon no increase in the Bid Price and/or Contract Time.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.