Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

October 30, 2023

December 4, 2023

Multiple Locations

Renovation

No Information to Display

$311,260.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, New Bloomfield, PA

Subscribe to View Full Documents

McCormick Taylor, Inc. has been contracted by the Pennsylvania Department of Transportation (PennDOT) to perform an in-depth inspection, concrete sampling, and material testing on the bridge that carries SR 0011 over Little Juniata Creek and Creek Road (BMS 50-0011-0220-0000), located in PennDOT District 8-0, Perry County, Pennsylvania. McCormick Taylor, Inc. will require services of a contractor to provide the following services: o 4" diameter vertical concrete cores in bridge deck o 4" diameter horizontal concrete cores in pier caps and abutments o 2" diameter vertical concrete cores in top flange of prestressed box beams (at bridge deck core locations) o 2" diameter horizontal concrete cores in pier caps and pier columns o All required Maintenance and Protection of Traffic (MPT) to obtain the identified concrete cores consisting of shadow vehicles, warning signs, flags, cones, two-way radios, flaggers, etc. shall be in accordance with PennDOT Publication 213. The contractor and/or its subcontractor must be able to provide the short-term traffic control patterns as shown in the Temporary Traffic Control Guidelines (Publication 213) with current revisions. Available date 8/14/2023 3:00 PM All work must be completed within thirty-five (35) calendar days of execution of Contract Question Deadline 08/21/2023 at 3:00 PM ET

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects