Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

September 21, 2023

No Information to Display

1524 27th St

Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

1524 27th St, Rock Island, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

A bid tabulation shall be posted online afterward. All questions shall be directed to the Construction Officer at 309-732-2906 Scope of Work The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. This project will require a licensed plumber to connect new sewer line to the existing home sewer. This project will require removal of the basement floor in order to connect to existing sewer line in the home. Installing a new 4" line from inside the home under the floor down the hill connecting to the 24" main line near the bottom of the ravine. A clean out must be installed with in 5' from the outside foundation wall. Underground rough-in the basement will need to be inspected before covering. The connection at the main will need inspected before covering. Locate the existing connecting sewer at the main and discount using approved methods, an inspection shall be called and okayed before covering the disconnection of the abandon line. Concrete shall be poured in the basement to meet existing grade and finished to match the floor. Clean backfill free of wood and other debris replaced in the excavation holes. Job site visit is required in order to bid on this project. Permits must be valid before work starts. Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet all project objectives. The contractor shall have 30 days to complete the work from the date of contract signing. Change work orders over the course of the project are strongly discouraged. Bidder Qualifications & Requirements 1. Bidders must be currently licensed with the Illinois Secretary of State, bonded, and insured. 2. Bidders must have or be able to obtain all applicable licenses and permits in addition to meeting all local, state, and federal requirements to perform requested work. 3. Bidders must have and provide proof of General Liability, Vehicle, and Workers Compensation Insurances and name the City of Rock Island as a Certificate Holder. 4. Bidders must own or be able to rent sufficient equipment to complete the work. Contact Information The primary contact person for this project is the City's Construction Officer. Jeff Laxton CED Department 1528 3rd Avenue Rock Island, IL 61201 309-732-2906 laxton.jeff@rigov.org

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects