Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 14, 2023

September 25, 2023

October 30, 2023

To Be Determined

Site Work

No Information to Display

$300,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Quincy, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Counties: Gadsden, Leon Road Name: Midway Ops Maintenance - Guardrail Remove and Replace Limits: 55320000 Project(S): 42215127233(*) Federal Aid No: N/a Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 30 Days Contract Days: 35 The work under this Site-Specific Contract consists of the complete removal and replacement of existing guardrail systems within FDOT maintained right of way in Gadsden and Leon Counties. The specific sites for removal and replacement are detailed in the Appendices. Maintenance of Traffic and Mobilization are incidental to the bid items listed. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Departments budget. Maintenance contracts do not require a contractor to have a certificate of qualification, unless stipulated in the project description and specifications. If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. FLDOT - Call Order: 006 - Midway Ops Maintenance - Guardrail Remove and Replace Question Deadline 09/07/2023 at 5:00 PM ET If You Have Any Technical Questions, You Must Go Through Our Bid Question & Answer Site. Question Posted to This Site on the Seventh Calender Days Prior to the Bid Opening Will Be Responded to by the Department. Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on Electronically.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.