Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 9, 2023

November 8, 2023

SW 4th St

Paving, Site Work

No Information to Display

$11,160.00

Public - City

img_map_placeholder

SW 4th St, Topeka, KS

Subscribe to View Full Documents

This project consists of removing and replacing the existing ADA sidewalk ramp at SW 4th Street and SW Frazier Avenue and adjacent sidewalk, removal of the courtesy ramp across to the west of the 4th Street ADA ramp replacement and infill with topsoil; and curb and gutter replacement at the same general locations. American Rescue Plan Act (ARPA) contractual provisions apply to this project. Davis Bacon Wages DO NOT apply to this project. Q And A Close8/30/2023 10:30:00 PM

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.