Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

November 23, 2023

January 17, 2025

1309 N Wilton Pl

Paving, Renovation, Site Work

No Information to Display

$3,498,000.00

Public - County

img_map_placeholder

1309 N Wilton Pl, Los Angeles, CA

Subscribe to View Full Documents

JOb No: 21-100.C1 For information or questions regarding this RFQ contact Remil Mangali at (213) 241-2180 or via email at remil.mangali@lausd.net. PROJECT LOCATION: Bernstein High School is located at 1309 N. Wilton Place, Hollywood, CA 90028 ADA Upgrades The scope of this project includes additional paving for Path of Travel and accessible concrete seating. Renovations for two restrooms located near Soccer Field. Installation of new Hi-Low drinking fountain. Provide new roof cap, roof curb. Install new signages. Install new duct up to roof per Mechanical plans. Install new WC including accessories as shown on Plumbing plans. Civil Scope. Includes installation of new HDPE Storm Drain and subdrain lines around the perimeter of the field, catch basin cleanouts and flat drains. Synthetic Turf Replacement. Replacement of existing turf at soccer/softball field, including school Logo. Synthetic turf colors must be pre-approved by OEHS. Landscaping. Remove and dispose existing trees and planting, irrigation equipment including lateral lines, heads, valve boxes. Protect 3" mainline. Provide new landscape wall plants and trees, new irrigation system to connect to existing controller. Install Stabilized decomposed granite and concrete paths. Refinish and add new nets to existing moveable soccer goals. Concrete Paving. Scope include to sawcut and remove paving at portion of Fire Lane, regrade and install heavy duty concrete. Metal Fence: Contractor is to fabricate and install new 16' height chain link fence where existing fence is located near N. Van Ness Avenue according to details on Architectural plans and Specifications. 1. ACCESSIBILITY UPGRADE TO SPORT FIELD RESTROOMS 2. INSTALL NEW PLANTERS 3. NEW ACCESSIBLE SEATING AND PATH OF TRAVEL 4. NEW LOW CONCRETE WALLS 5. REPLACE APP.83.527SF.OF SOCCER/SOFTBALL FIELD 6. REPLACE AND INSTALL NEW 16' FENCE.

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.