Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

December 18, 2023

October 22, 2024

Fisher St & N Walker St

Paving, Site Work

No Information to Display

$1,605,855.00

Public - City

img_map_placeholder

Fisher St & N Walker St, Taunton, MA

Subscribe to View Full Documents

The work in this Contract includes, but is not limited to: North Walker Street: Construction of three-inch, PVC low pressure sewer system and service connections Fisher Street: Construction of three-inch, PVC low pressure sewer system, gravity sewer and service connections, and Water Main Improvements Associated pavement and appurtenant work related to items listed above as more particularly indicated, shown or described in the Drawings, Specifications, and other Contract Documents The Time of Substantial Completion for this project shall be 180 days from the Contractor's receipt of a Notice to Proceed. Minimum Wage Rates as determined by the Executive Office of Labor and Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Sections 26 to 27D, as amended, apply to this project. It is the responsibility of the contractor, before bid opening, to request if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed work under this contract. Bidders must fully comply with Subpart C of 2 CFR Part 180 and 2 CFR Part 1532, entitled Responsibilities of Participants Regarding Transactions (Doing Business with Other Persons). Phone number Mailing address City of Taunton, MA Department of Public Works The Contractor shall begin work within 30 calendar days of receipt of a Notice to Proceed. This contract shall be completed within 180 days from the issuance of a Notice to Proceed. This project is subject to the Safety and Health Regulations of the U.S. Department of Labor set forth in Title 29 CFR, Part 1926 and to all subsequent amendments, and to the Massachusetts Department of Labor and Industries, Division of Industrial Safety 'Rules and Regulations for the Prevention of Accidents in Construction Operations' (Chapter 454 CMR 10.00 et seq.). Contractors shall be familiar with the requirements of these regulations The Owner and Engineer, being considered the sole and only judge, reserves the right to waive any informality in, or to reject, any or all bids, should the Owner deem it to be in the Owner's best interest to do so Direct all inquiries in writing to Chris Cronin, P.E., Vice President, BETA Group, Inc. Email: JS-Bennett-1-Bids@BETA-Inc.com.

54 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.