Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 20, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$15,000,000.00

Public - County

img_map_placeholder

Multiple Locations, The Woodlands, TX

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The San Jacinto River Authority is requesting Statement of Qualifications (SOQs) for Professional Engineering Services for the Lift Station No 1 Gravity Main Bypass and Decommissioning Project. This Request for Qualifications (RFQ) solicits information that will enable SJRA to select one or more Consultant(s) that shall provide professional services for professional design engineering services for decommissioning of Lift Station No. 1 and diverting the influent flow to the existing 42-inch gravity sanitary sewer line located near the intersection of Woodlands Parkway and Lake Front Circle via a new gravity sanitary sewer line. Consultant shall provide professional engineering services for decommissioning of Lift Station No. 1 and diverting the influent flow to the existing 42-inch gravity sanitary sewer line located near the intersection of Woodlands Parkway and Lake Front Circle. Services shall consist of: Provide project management, preliminary design including recommendation for gravity sewer placement, identification and coordination of any utility conflict, final design, construction phase services, survey, and geotechnical investigation to facilitate the project. The project will comprise of a new gravity sanitary sewer line to convey flow from the existing influent line of Lift Station No. 1 to the proposed tie-in location to the existing 42-inch gravity sanitary sewer as well as recommendations and design for the extent of decommissioning of Lift Station No. 1. Following design, the consultant will provide procurement assistance and construction phase services during construction, unless otherwise notified by SJRA. Consultant may be required to perform site visits, document site observations, participate in progress meetings, upload reports to SJRA's Procore site, verify compliance with specifications, and other services to support quality assurance efforts. This project includes the review of previously developed master plans and technical memorandums, record drawings, and condition assessments of the facility. The selected Respondent will develop engineering reports, construction drawings and technical specifications. Question Deadline 09/08/2023 at 6:00 PM CT

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.