Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

September 5, 2023

July 31, 2024

6250 E 1200 S

Site Work

No Information to Display

$110,000.00

Public - State/Provincial

img_map_placeholder

6250 E 1200 S, Heber City, UT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Lake Creek Phase II Cut and Pile This is the second phase of the Lake Creek Project and services will provide for the removal of dead and downed debris, dead standing, and identified live standing within 13.6 acres on private property in Wasatch County. The terrain is generally gently sloped areas adjacent to Lake Creek road. The goal of the project is to reduce wildland fire potential by reducing fuel build up and improve overall forest health which has been growing and accumulating within the forest for decades. The Contractor shall supply all labor, equipment, supervision, transportation, supplies, lodging/camping arrangements, and incidentals to perform all work as set forth in these specifications. The contract is designed to meet the specific needs of the landowner and the State of Utah, Department of Natural Resources, Division of Forestry, Fire, and State Lands (FFSL). Question Deadline: 08/23/2023 at 2:00 PM MT Contractor will complete this project between September 5th 2023 and July 31st 2024. The contractor will notify the project manager one week prior to project begin date. The State reserves the right to impose additional fire restrictions due to severity of conditions.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.