Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 9, 2023

November 23, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Multiple Locations, Somerville, TN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Town of Somerville is seeking sealed bids from paving companies who are interested in contracting with the Town for the FY22 Road Paving Project. The Project shall include milling of any town road which has curb and gutter, repairing any areas that require it before paving can take place, preparing the current surface and resurfacing the designated roads with a 1.5-inch layer of compacted hot mix asphalt paving. The Project shall be awarded, subject to budget considerations, to the lowest best evaluated bid, and the Town's evaluated decision shall be final. It is the policy of the Town of Somerville that all Townsponsored public meetings and events are accessible to people with disabilities. If you need assistance in participating in this meeting or event due to a disability as defined under the ADA, please call the Town's ADA Coordinator at (901) 465-7300 at least three (3) business days prior to the scheduled meeting or event to request an accommodation The work is generally described as repairing/rehabilitating base and paving of certain Town streets for which the Contractor shall furnish all labor and materials necessary to facilitate a finished product as described in the Contract documents. The Contractor shall also provide a one-year warranty on all materials and workmanship, which shall commence upon final acceptance of the work by the Town. The warranty shall be secured by Bond, which shall not be released until the Town and the Contractor conduct a final inspection of the project on the oneyear anniversary date at which time the Town is satisfied that the project is in satisfactory condition and accepts it for maintenance.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.