Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2023

October 1, 2023

September 30, 2024

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Indianola, MS

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Bridge Repair/construction or Reconstruction Hot Mixes and Crushed Limestone, Fuels, Oil, Gas, Etc., Grader Blades, Gravel, Sand and Concrete, Lumber and Piling, Use of Draglines, Bulldozers, Piledrivers and Dirt Moving Equipment, Custom Hauling of Dirt and/or Cinders and Slag by Dump Truck, Use of Tractor for Mowing Minimum 135 Horsepower With Power Shift, Three Point Hitch and P.t.o., Propane With Bidder Supplying Tank for at Least 1,000 Gallons,All Grades of Liquid Asphalt for Period of 12 Months Roadside Spraying on a Per Mile Basis With Vendor Supplying Liability Insurance, Sign Making Materials, Fly Ash, Soil Cement. The Period October 1, 2023, Through September 30, 2024. The Board Reserves the Right to Reject Any and All Bids and to Terminate Same During Contract Period. The Board Further Reserves The Right to Consider Bids Which Are Made for a Period of Time Which Is Shorter or Longer Than That Set Forth Above, When No Bids Are Received for the Time Period Indicated, and When This Board Deems It In the Best Interest of Sunflower County Citizens to Consider Bids Received for a Shorter or Longer Period of Time.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.