Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2023

November 13, 2023

September 30, 2024

Sand Rd and N Center St

Renovation, Site Work

No Information to Display

$415,360.00

Public - City

img_map_placeholder

Sand Rd and N Center St, Marshalltown, IA

Subscribe to View Full Documents

The construction of a new municipal water supply well to replace Well No. 5. Project also includes the installation of a pitless unit, submersible pump and motor, and the abandonment of Well No. 5. Each Bid shall be accompanied by a Bid Bond, certified check, cashier's check, or certified credit union share draft in an amount equal to five (5) percent of the total amount of the Bid. If Bid Bond is submitted, it must be on the form provided with the Contract Documents. The certified check, cashier's check, or certified credit union share draft shall be drawn on a bank in Iowa, a bank chartered under the laws of the United States of America, or said certified share draft shall be drawn on a credit union in Iowa or chartered under the laws of the United States and payable to the Treasurer of the Owner as security that if awarded a contract, the Bidder will enter into a contract at the prices Bid and furnish the required Performance, Payment and Warranty Bond(s) each in the amount of one hundred percent of the Work, and provide a Certificate of Insurance. The certified check, cashier's check, or certified share draft may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the Bidder fails to execute a contract or file acceptable Performance, Payment and Warranty Bond(s) or provide an acceptable Certificate of Insurance within fifteen (15) days after the acceptance of said Bid by resolution of the Owner. Work on said project shall commence within thirty (30) days of a written notice to proceed. The Work will be substantially completed on or before August 30, 2024 and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before September 30, 2024. Liquidated damages in the amount of Five Hundred Dollars ($500.00) consecutive per day will be assessed for each day that the work remains uncomplete after the completion periods indicated. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. All questions to the Engineer shall be submitted in writing via email to the following: 1. Engineer: Short Elliott Hendrickson Inc. a. Katie Kinsey, PE, Project Engineer b. Email: kkinsey@sehinc.com

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.