Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

October 6, 2023

December 31, 2023

Eiterman Rd

Site Work

No Information to Display

$173,000.00

Public - City

img_map_placeholder

Eiterman Rd, Dublin, OH

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The CITY OF DUBLIN reserves the right to accept or reject any or all bids, to waive any informalities or irregularities in the bidding process and to enter into a contract with the bidder whom, in its opinion, offers the lowest and best bid. The owner intends and requires that this project be completed by December 31, 2023 This project intends to build a path along the designed route and connect one side of Dublink conduit to the other, generally running along the right of way near State Rt. 161, just west of Rt. 33 (see design plans). It is also intended to pull 144 count fiber and splice to complete the Dublink fiber pathway. The cost estimate for the Project is $173,000.00.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects