Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2023

October 13, 2023

January 11, 2024

Jason Dr

Site Work

No Information to Display

$280,000.00

Public - City

img_map_placeholder

Jason Dr, Livingston, LA

Subscribe to View Full Documents

Questions about this procedure shall be directed to the Designer at Forte and Tablada Inc., 9107 Interline Avenue, Baton Rouge, Louisiana 70809. Phone (225) 927-9321. Attention Tyler H. Branch, P.E., Civil Project Manager. E-Mail Address: tbranch@ForteandTablada.com. Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of Municipal and Public Works Construction. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). The Owner reserves the right to reject any and all bids for just cause. Such actions shall be in accordance the Louisiana R.S. 38:2214. The Owner requires that each bidder attach to his bid a certified check, cashier s check, or bid bond equivalent to 5% of the total bid as evidence of good faith of the bidder. Sureties used for obtaining bonds must appear as acceptable on the U.S. Department of the Treasury Circular 570. No bidder may withdraw his bid within forty-five (45) days after the actual date of the opening thereof except as provided by law. Any person with disabilities requiring special accommodations must contact LOHSEP no later than seven (7) days prior to the bid opening. SCOPE OF WORK: To remove and replace drainage structures and pavement at the intersection of Jason Dr. and Darren Dr. in Denham Springs, LA. New curb inlets, grate inlets, and up-sized RCP and RCPA will be installed. New Asphaltic Concrete Pavement Patching and Combination Curb and Gutter will be installed at the intersection. The existing downstream RCP (to remain) will be cleaned.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects