Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2023

November 6, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$1,266,633.00

Public - County

img_map_placeholder

Multiple Locations, West Orange, TX

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

GENERAL This contract provides for the rehabilitation of existing 4'', 6'', 8'', 10'' and 12'' sanitary sewer lines throughout the City of West Orange for Orange County WCID No. 2. This project will be funded by TWDB. This contract shall provide for the necessary labor, equipment, tools, materials, and all other related construction for the proposed project. SUMMARY OF WORK Base Bid The Contractor shall rehabilitate approximately 722 linear feet of 4'' sanitary sewer lines by pipe bursting with 6'' SDR-17 HDPE sewer line, all in accordance with the plans and specifications. The Contractor shall rehabilitate approximately 4636 linear feet of 6'' sanitary sewer lines by pipe bursting with 8'' SDR-17 HDPE sewer line, all in accordance with the plans and specifications. The Contractor shall rehabilitate approximately 1909 linear feet of 8'' sanitary sewer lines by pipe bursting with 10'' SDR-17 HDPE sewer line, all in accordance with the plans and specifications. The Contractor shall rehabilitate approximately 315 linear feet of 10'' sanitary sewer lines by pipe bursting with 12'' SDR-17 HDPE sewer line, all in accordance with the plans and specifications. The Contractor shall rehabilitate approximately 714 linear feet of 15'' sanitary sewer lines by pipe bursting with 18'' SDR-17 HDPE sewer line, all in accordance with the plans and specifications. The Contractor shall remove and replace 36 manholes along the easement line with new 48'' fiberglass manholes, all in accordance with the plans and specifications. The Contractor shall install 12 new manholes along the easement line with new 48'' fiberglass manholes, all in accordance with the plans and specifications. Contractor to locate and rehabilitate existing sanitary sewer services on the proposed lines by pipe-bursting using 4'' HDPE SDR-11, or remove and replace with SCH 40 PVC, including cleanouts and tap, all in accordance with the plans and specifications. Pre-Construction. Clean and TV approximately 8,296 linear feet of existing sanitary sewer line all in accordance with plans and specifications. Post-Construction. TV approximately 8,296 linear feet of new sanitary sewer line all in accordance with plans and specifications. Contractor shall provide bypass pumping to ensure continued operation of the collection system during the rehabilitation process. CONDITIONS ALONG THE ROUTES The Contractor's attention is called to various physical conditions along the routes as follows. Overhead power lines are located near or within the project site. The Contractor shall notify proper authorities at least 72 hours before construction begins. The Contractor shall take precautions to avoid damage to power lines, foundations, guy wires, and appurtenances. The Contractor shall observe all applicable OSHA and owner requirements while working near the overhead power lines including restriction of height of equipment. Underground utilities exist near or within the project area. During construction the Contractor shall take the necessary precautions to avoid damaging the existing utilities within the limits of the project site. SPECIAL REQUIREMENTS The Contractor shall contact Mr. Russel Love at (409)-883-4003 prior to starting any work within the project site. The Contractor shall restore all project locations to their original condition or better prior to the project completion. Question Deadline 08/28/2023 at 5:00 PM CT

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.