Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

September 15, 2023

January 13, 2024

100 Minuteman Pkwy

Renovation

No Information to Display

$147,378.00

Public - State/Provincial

img_map_placeholder

100 Minuteman Pkwy, Frankfort, KY

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Contractor shall provide all of the materials and perform all the work described in the Specifications and/or shown on the Drawings. Remove and replace the Lighting System at the USP&FO Warehouse shall be installed from the existing Panels in Building #120, located at the Boone National Guard Center, which is located at 100 Minuteman Parkway in Frankfort, KY. The contractor shall be responsible for all required demolition and removal of the existing controls. All systems shall be installed per Kentucky Building Code with Current Revisions, Americans with Disabilities Act, International Building Code, and National Electrical Code. The Owner's preferred daily work schedule shall be Monday-Friday 8 hour/day. There are no Contractor working days on Saturday or Sunday. A 48 hour notification is required for any outage of the existing Power System. Any damaged utility by the Contractor must be put back into service immediately. Instructions are attached. Contractors must load their Bid Documents COMBINED into one PDF document under the corresponding RFB in MOVEit in order for it to be received. IF BID IS NOT UPLOADED IN THE CORRECT FOLDER IN MOVEit, THE BID WILL BE DEEMED NON-RESPONSIVE. Bidders are encouraged to take a screen shot verifying bid submittal. This is a secure website, no one can see these bids but the buyers. They are date and time stamped when submitted. Please note that the instructions for MOVEit state that contractors will be notified when their bid is received. Buyers will NOT be notifying contractors. All results will be posted to Lynn Imaging planroom after the bid opening and review. If additional information is needed from the successful bidder, the buyer will be in contact. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids.All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects