Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

May 21, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$434,008.00

Public - County

img_map_placeholder

Multiple Locations, Benton, AR

Subscribe to View Full Documents

The project will consist of construction of the approaches to the bridge for the new trail. There will be necessary coordination with the contractor constructing the bridge. BEGIN JOB 061671, JOB 061671 A certified check or bank draft, payable to the order of Saline County negotiable U.S. Government bonds (at par value), or satisfactory bid bond executed by the bidder and an acceptable surety in an amount equal to five percent (5%) of the total of bid shall be submitted with each bid. Saline County reserves the right to reject any or all bids, or to waive any informalities in bidding This item shall consist of specifications relative to the coordination of work during construction operations at the beginning, and/or intermediate points, and/or end of contracts or jobs and shall be supplementary to Section 105, Control of Work, of the Standard Specifications, Edition of 2014. Coordination of work will be necessary with the Contractor for Job 061671, Saline Co. Old River Bridge (TAP-21) (S), and with any other contractors that may have active jobs adjacent to this project during the construction period. CONSTRUCTION: The Contractor shall schedule and perform the several operations of construction at the beginning and/or end, or any intermediate point of the project in such a sequence that work on the facility will progress in an expeditious manner. The Contractor shall furnish the Engineer for approval a plan or schedule of his proposed work at the termini of the project as well as any intermediate points where coordination with another contractor will be necessary. He shall keep the Engineer informed or advised of any action or cause that might affect the successful coordination of work with other contractors.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.