Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2023

September 30, 2023

February 17, 2024

475 Coffee Tree Rd

Renovation

No Information to Display

$153,000.00

Public - State/Provincial

img_map_placeholder

475 Coffee Tree Rd, Frankfort, KY

Subscribe to View Full Documents

**As of October 13, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** The project is located at the Kentucky State Police Training Academy. It is the barn shaped building with the gambrel roof off by itself just down Coffee Tree Road from the KSP training Academy entrance, previously used by the Kentucky Legislative Research Commission. Project consist of recladding the existing office building with new metal roof & wall panels, providing new windows, and a new front porch. All existing roof areas shall have metal roof panels and asphalt shingles removed down to the existing roof sheathing. Repair to wood decking will be required as necessary (by unit price). New roofing will consist of 24 ga roof panels over advanced waterproofing roof underlayment. Remove all existing exterior vinyl siding and fan board down to original exterior wood cladding. All existing exterior cmu & wood walls (at 2nd floor) to be coated with an air barrier prior to new enclosure system consisting of 24 ga. metal wall panels at all walls on galv. hat channels. Provide new rake, fascia, valley, wall, & soffit prefinished metal trims + gutters & downspouts at full perimeter. All PVDF finishes for new metal panel systems, soffit, ceiling, and trims shall have 35-year paint warranty (Kynar-500 paint). Project Includes exterior painting of existing exterior egress stair, hollow-metal doors/frames and exposed concrete foundation. Existing front porch column and roof structure will be demolished and replaced by a prefinished aluminum porch structure. A reinforced concrete mow strip will be placed along the left-side of the building and portions of the rear façade. The existing plant bed on the right-side of the building will be filled in with reinforced concrete to existing curb.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.