Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 4, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$250,000.00

Public - County

img_map_placeholder

Multiple Locations, Pink Mountain, BC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

North Peace Fall Fair upgrades. The North Peace Fall Fair is owned by the Peace River Regional District, and operated by agreement by the North Peace Fall Fair Society. Over a number of years, the Society has grown the facilities on the grounds to include a number of buildings and other structures to accommodate the fair, and to commemorate the agricultural history of the North Peace. In order to ensure continued safe use of these buildings and to ensure the grounds are being used to the greatest extent, a feasibility study is required. TIMELINE: Request for proposals from qualified proponents to submit proposals for feasibility study, has been issued by the owner. The feasibility study would include: conceptual design and cost estimate to upgrade the Adeline Kelly Hall to a public occupancy building, a needs assessment that examines the existing buildings and structures and identifies opportunities for increased usage, options for operating models, new or upgraded buildings, and operating costs. The study is to be completed, including final report submission and findings presentation to the Board of the Peace River Regional District on or before December 8, 2023.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.