Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 9, 2023

No Information to Display

1013 W Reynolds St

Site Work

No Information to Display

$50,000.00

Public - City

img_map_placeholder

1013 W Reynolds St, Springfield, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City reserves the right to accept or reject any or all proposals. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act. Female and Minority Business Enterprises are encouraged to submit bids for this Contract. An Equal Opportunity Contractor. SCOPE A. These specifications are intended to cover the purchase, installation, removal, and disposal of a chain link substation perimeter fence. The fence is to secure an area measuring approximately 1200 linear ft. (including a partition between the substation and generation yards), with four (4) 20 ft. double drive gates and two (2) 4 ft. walk gates, per the attached drawing. The installation will enclose an existing substation located at 1013 Reynolds St., Springfield, IL 62702. B. Fence delivery and erection shall be arranged with Chris Lucchesi after receiving purchase order by calling (217) 321-1458. C. Perimeter fence installation, removal, and disposal at Reynolds Substation shall begin and be completed without interruption, within working days specified in Section III, Subsection 2.0 - Schedule, after a start date has been established, or as specified by CWLP. All grounds, which may be damaged during installation, shall be rectified by installer after completion of fence. D. A site visit for measurements can be scheduled during the bid period and shall be arranged with contact listed above. Please provide a twenty-four hour notice prior to a site visit. The deadline for questions is Monday, August 28, 2023 at 12:00 p.m

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects