Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2023

October 5, 2023

March 1, 2024

To Be Determined

Renovation

No Information to Display

$250,000.00

Public - City

img_map_placeholder

To Be Determined, Missouri Valley, IA

Subscribe to View Full Documents

The Project includes the following Work: Replacement of the water control system, including the master control panel and filter control panel at the water treatment plant, the control panels at the 3 water supply well houses, and the SCADA system in the water treatment plant office, along with other related and miscellaneous appurtenances. PreBid Date: Not furnished If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $30.00 payable to A&D Technical Supply Co., Inc. Documents must be returned within 10 days of the bid opening, complete and in like new condition to obtain a refund. After 10 days, the deposit will be forfeited. One reminder phone call will be placed before deposit is forfeited.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects