Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 11, 2023

May 13, 2024

December 1, 2025

Multiple Locations

Renovation

No Information to Display

$1,643,000.00

Public - County

img_map_placeholder

Multiple Locations, Kissimmee, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Tohopekaliga Water Authority (Toho) invites qualified firms licensed under chapter 489, Florida Statutes, to submit Statements of Qualifications (SOQ) to provide Construction Manager at Risk (CMAR) Services for the upgrade of Water Treatment Plant #4 in the Toho East service area. CMAR services will be procured under section 255.20, Florida Statutes. Water Treatment Plant (WTP) #4 is an existing facility with a permitted capacity of 9.0 mgd. The existing average daily flow is 7.4 mgd. The project will replace the existing treatment process with a fixed bed Ion exchange process while the facility remains in operation. The project has an aggressive schedule with a partial completion date goal of December 2025 to begin producing potable water through the Ion exchange vessels. Completion of all project components are not required by the December 2025 goal. The schedule will require pre-purchasing materials and equipment early in the design phase. The preliminary design report will be completed in October 2023. Respondents to this Invitation to Submit Qualifications must have proven expertise and extensive experience in the Construction Manager at Risk process related to water treatment facilities on existing facility sites with expedited delivery schedules. Respondents to this RFQ should demonstrate experience and resources related to: o Installing and starting up fixed bed Ion exchange units o Working on and maintaining operation at active WTP sites o Accelerated delivery of projects Respondents should also demonstrate they have adequate resources and expertise to meet the project schedule goals. Deadline to submit Questions Aug 28th 2023, 12:00 PM EDT : Online.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.