Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 14, 2023

October 13, 2023

May 10, 2024

To Be Determined

Site Work

No Information to Display

$495,000.00

Public - City

img_map_placeholder

To Be Determined, Paso Robles, CA

Subscribe to View Full Documents

The Project includes, but is not limited to, drainage repairs and recontouring, drainage basin rehabilitation, drainage recontouring, headwall installation, as well as all necessary incidental work associated with five different locations throughout Paso Robles. Additional project details are shown on the plans and/or are specified herein. Drainage repairs and recontouring, drainage basin rehabilitation, drainage recontouring, headwall installation, as well as all necessary incidental work associated with five different locations throughout Paso Robles. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of El Paso de Robles as bid security. The bid security shall be provided as a guarantee that within fifteen (15) working days after the City provides the successful bidder the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Bids shall be valid for a period of 90 calendar days after the Bid opening date. City has obtained the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in San Luis Obispo County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this contract. City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the Base Bid alone. City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.