Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

November 13, 2023

December 4, 2023

Bear Cove Terminal

Outdoor Lighting, Site Work

No Information to Display

$70,000.00

Public - State/Provincial

img_map_placeholder

Bear Cove Terminal, Port Hardy, BC

Subscribe to View Full Documents

The scope of work for the Project includes the electrical scope of work associated with the installation of the garbage compactor, as is more particularly set out in Schedule “A” – Scope of Work. The general requirements of the Scope of Work include: Cable installation from the electrical room up to the location of the future compactor; and Lighting installation. Prior to the electrical scope of work execution, a civil contractor will be on site for the construction of a concrete pad, waterline and electrical conduit installation. The electrical Contractor shall expect to coordinate with BC Ferries regarding the scheduling and timing of the civil and electrical work execution.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.