Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

October 6, 2023

November 15, 2024

Multiple Locations

Site Work

No Information to Display

$700,000.00

Public - City

img_map_placeholder

Multiple Locations, Stuart, IA

Subscribe to View Full Documents

Provide all labor, equipment and materials necessary to construct approximately 12,220 linear feet of 6-inch through 15-inch cured in place pipe lined sanitary sewer, reinstating all active services, sewer main point repairs, manholes, earthwork, surface restoration and miscellaneous associated work, including cleaning, testing and cleanup. The duration of the work is critical to the project so as to minimize the disruption associated with the project to the property owners and to provide services to proposed residences. Damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each day that all work on the project, including surface restoration, is not completed after November 15, 2024 at the sole discretion of the City with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. At the option of the City, damages may be deducted from any retainage prior to release, the final payment to contractor, or through the commencement of a cause of action by the City, in the City's sole discretion. The selection by the City of any particular course of action hereunder is not exclusive and shall not preclude the pursuit of additional remedies by the City. In the event the City institutes legal proceedings, the Contractor shall be responsible for any and all attorney's fees and expenses. The City Council reserves the right to reject any or all bids, to waive informalities or technicalities in any bid and to accept the bid which it deems to be to the best interest of the City

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.