Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 22, 2023

January 22, 2024

No Information to Display

5100 Sierra College Blvd

New Construction, Site Work

No Information to Display

$20,000,000.00

Public - City

img_map_placeholder

5100 Sierra College Blvd, Rocklin, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The selected firm will provide construction drawings and project management through the completion of construction. This will require regular meetings with City staff and the construction team. The construction team will be selected through a closed bid process, but the selected architectural firm will be expected to participate in the bid process by being available to respond to questions from bidders Qualified firms for professional Architectural and Engineering Services for the design and construction of a new fire station The City will be constructing a fourth fire station off of Sierra College Boulevard and Stadium Way. The station will be located in the College District and expected to adhere to the architectural standards of the design district. This station will be constructed on an approximately 2-acre parcel directly adjacent to Sierra Community College, and will provide coverage for east Rocklin (see section 4.3 Proposed Site Location). Project elements will be finalized through the design process; however, it is anticipated that Station 22 at a minimum should include: o Three (3) Pull Through Apparatus Bays o Dorm Rooms for Four (4) Fire Personnel with restroom and showers o A common or day area with a kitchen o Office space o Fitness room o Turnout Storage Room o Self-Contained Breathing Apparatus refill station o Backup generator Additional specifications about Station 22 can be found in section 4.4 Site and Building Criteria. All questions and inquiries must be submitted via email to Elizabeth Sorg at elizabeth.sorg@rocklin.ca.us. The deadline to submit questions is August 30, 2023 The City also reserves the right to waive any informality in any proposal and to delete certain items listed in the proposal as set forth therein. The selection committee will make a recommendation to the approving authority. The total budget for this project is estimated to be between $17,000,000 and $20,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.