Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 1, 2024

October 31, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Avonhurst, SK

Subscribe to View Full Documents

clay cap rehabilitation of 6.8km of Grid 622, between Highway #1 and Highway 33. Rehabilitation of a 6.8 km of graveled roadway structure, 8.6 meter road top and 3:1 side slopes Remove and Replace Stripping along side-slopes. Subgrade Preparation - 12,650 m3. Install 44,790 m3 of Prepared Clay Cap for 6.7 kilometers. Remove and Replace CSP 900mm (2) Install CSP 1200mm Extensions (4) Incorporate Traffic Gravel for 6.7 kilometers. (RM supplied Gravel) Any questions related to the tender or the work laid out herein can be directed to Steve Gardner of Clifton via Cell (306) 536-3962, or email Steve_Gardner@clifton.ca. or Zac Nichol of Clifton via Cell (306) 531-2690 or email zac_nichol@clifton.ca.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.