Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 27, 2023

No Information to Display

To Be Determined

New Construction, Site Work

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

To Be Determined, Parlier, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The United States Department of Agriculture (USDA), Agricultural Research Service (ARS) has a construction requirement for Farm Equipment Storage - Includes the purchase of a 48x30x13 ft. PEMB, and construction & installation according to industry standards. PEMB has 3 sidewalls and a roof with 3 bays open on one side only. One 24 ft. bay, and two 12 ft. bays. This structure will be used to store/protect farm equipment used in Water Management Research. The Contractor shall provide all labor, equipment, materials, supplies, transportation, and supervision performing all required work in accordance with the plans and specifications for this requirement. In accordance with Federal Acquisition Regulation (FAR) 36.204 the magnitude of this construction project is between $25,000 and $100,000. USDA will issue a Firm Fixed Price Construction Contract. The Request for Quote (RFP), 12905B23Q0200 may be issued on or around August 28, 2023. The requirement will be 100% Small Business set aside, under NAICS Code 236220 with a size standard of $45.0M. Information concerning the REE policies and procedures regarding the definitization of equitable adjustments for change orders under construction contracts and the time required for definitization of those actions per 15 U.S.C. 644 is available at https://www.ars.usda.gov/afm/apd/acquisitions/. Completion timeframe for the resulting contract is to be determined. The RFQ will be accessible via https://sam.gov/ in the "Contracting Opportunities" section. Potential Offerors are responsible for monitoring this site for release of the RFP package and any amendments. All offerors shall be registered with the System for Award Management Registration per FAR Clause 52.204-7 and 52.204-8. No paper copies of the solicitation will be mailed, and telephone requests will not be honored. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.