Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

October 2, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Milltown, NJ

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000327486 Question Acceptance Deadline 08/28/2023 02:00 PM EDT Questions are submitted online Yes If indicated, bid proposals must be accompanied by a certified check, cashier's check, or bid bond in the amount of ten per centum (10%) of the total amount of the bid, but not in excess of twenty thousand ($20,000) dollars and made payable to the Borough of Milltown. *The Borough reserves the right to extend this term of the contract upon application by the contractor providing evidence of circumstances beyond the control of the contractor preventing his successful completion of the contract. Scope and Purpose a. The Borough of Milltown is seeking a vendor to respond and complete the three (3) projects of: i. Concrete ADA Ramp ii. Sidewalk Repair List iii. Concrete Front Entranceway Municipal Building 2.0Concrete ADA ramp installations a. Three (3) installations at the corner of Ackerman Avenue and Townsend Street. b. Three (3) installations at Ackerman Ave and JFK Drive. c. Two (2) installations on the corner of Blueberry Drive and South Moetz Drive. d. Three (3) installations on the corner of W. Lincoln Avenue and George Street. e. Two (2) installations on the corner of Howard Street and Janet Court. f. Six (6) installations on Washington Avenue in various locations after the scheduled road work has been completed. g. Ramps must meet NJDOT, MUTCD, and Milltown Borough standard construction details. h. Engineered certification must be provided before acceptance by the Borough. 3.0Proposed Sidewalk Repair List 2023 a. Borough Park: i. 45 slabs - 4ft x 4ft x 4inch ii. 3 slabs - 13ft x 5ft x 4inches (includes ramp) b. JFK Dr.: i. 7 slabs - 4 x 4 x 4inches c. Main Street (near clock): i. 20ft X 16ft x 4inchesd. Footbridge (John St Side): i. 7 slabs - 4 x 4 x 4 inches e. Footbridge (Highland Dr. side): i. 8 x 6 x 4inches f. Riva Ave & N. Brook Dr.: i. 6 slabs 4 x4 x4inches g. N. Brook Dr.: i. 7 slabs 4 x4 x4inches h. Total approximate cubic yards: 19 -20cubic yards All questions are to be asked on bidnet direct.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.