Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 22, 2023

October 22, 2023

To Be Determined

Renovation

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

To Be Determined, Chey Mtn AFB, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Request for Quotes (RFQ) number FA251722Q0096 shall be used to reference any written quote provided under this RFQ. The RFQ document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2023-04, effective 06/02/2023. The North American Industry Classification Systems (NAICS) Code will be 811310, Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance. The size standard is $11,000,000.00. The purpose of this request for quote and solicitation is for Replace Swing Door from Chamber 4 to Electrical Bay, CMSFS, CO PROJECT DESCRIPTION: Remove and replace electric bay swing door into chamber 4, new door should be a manually operated roll-up overhead type door. The existing door is heavy and requires a fork lift to completely shut. The operation to using the locking mechanism places personnel fingers in a dangerous situation for pinching and smashing. The door no longer maintains a proper seal. Plan to include the removal of metal swing door and installation of a rollup door. This door will be insulated and have wind locks for air flow. The curtain style door will have the roll installed into the chamber vs. the inside of 12108. The operation will be manual with a chain to operate. All applicable representations and certifications shall be completed in SAM.gov. Failure to do so may result in quotes being considered as non-compliant. A site visit will be hosted at Cheyenne Mountain SFB on Wednesday 17 August 0900. Meet at Building 15 Visitor Center. Attendance is not mandatory. Proposals are due no later than 23 August 2023 by 13 :00 P.M. Mountain Standard Time by emailing contracting officer, david.rios_chinas.1@spaceforce.mil and ruben.guzman.5@spaceforce.mil.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.