Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 14, 2023

November 13, 2023

No Information to Display

433 N Virginia St

Site Work

No Information to Display

$1,327,000.00

Public - City

img_map_placeholder

433 N Virginia St, Prescott, AZ

Subscribe to View Full Documents

Question Deadline 09/05/2023 5:00pm The City of Prescott, Arizona, solicits interest from qualified persons, Design-Build Teams and or contractors to provide Design-Build services for Streets Division Administration Building. Only persons, Design-Build Teams, or contractors capable of providing the requested discipline of the services will receive consideration. The Streets Division Administration Building shall consist of a steel building on a concrete foundation (see attached conceptual floor plan). The City has acquired the steel building components of a 125' X 125' building. The building components are stored at the old wastewater treatment plant on Sundog Ranch Road, and at other City owned facilities. This project includes retrofitting the building components to suit the future needs of the Streets Division. The work includes design and construction of the building with office spaces, restrooms, ready room, locker rooms, equipment bays, storage areas, conference room, records storage room, dormitory, fitness center, mezzanine, and so on within the building. The area shall be insulated, heated, cooled, lighted, and ventilated. The office spaces shall be heated, cooled, plumbed, and have finished walls, doors, and windows. The office spaces shall have sound insulated walls to the open space. The facility shall include a fire suppression system. The work includes all site excavation, grading, paving, drainage, and utilities. All communications (other than delivery of the proposal as defined below) shall be addressed to the City project representative at the following: George Henderson Capital Project Manager City of Prescott Public Works george.henderson@prescott-az.gov

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.