Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 28, 2023

November 1, 2023

St Charles St

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

St Charles St, Rapid City, SD

Subscribe to View Full Documents

This project includes the rehabilitation of the north half of the intersection of St. Charles Street and 7th Street, including pavement, curb and gutter, sidewalk and C-wall and the replacement of approximately 400 feet of 8" ductile iron water main with pvc water main, and trench patch associated with the water main replacement. This project is needed due to a water main break in the existing ductile iron water main that caused pavement failures in the vicinity of the water main break. Every request for such interpretation shall be in writing and addressed to the City Project Manager/PE Michelle Lashley at Michelle.Lashley@rcgov.org , or by mail at 300 Sixth Street, Rapid City, South Dakota, 57701, and must be received at least five (5) days prior to the date fixed for the opening of bids in order for the City Project Manager to give it appropriate consideration. Each proposal must contain a certified check or cashiers check for five percent (5%) of the amount of the bid. Such check shall be certified or issued by either a State or National Bank and payable to the City of Rapid City, Rapid City, South Dakota, or in lieu thereof, a bid bond for ten percent (10%) of the amount bid All work with the exception of vegetation watering shall be complete by November 1, 2023.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.