Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

November 3, 2023

800 W 200 S

Paving, Site Work

No Information to Display

$157,000.00

Public - State/Provincial

img_map_placeholder

800 W 200 S, Richfield, UT

Subscribe to View Full Documents

Project Description: The road to the south of the college is in bad condition and will need to be removed and replaced. Also, on the north end of the campus a 3-way stop is needed that includes an island to help regulate traffic in that area. Mobilization. Traffic Control. Subsurface Investigation. Bituminous Surfacing 3". Bituminous Surfacing 4". Untreated Basecourse. Subgrade Granular Fill. Removal of Bituminous Surface. Remove Curb & Gutter. Remove Concrete Pedestrian Ramp. Pavement Sawing. Pavement Marking Paint. ADA Pedestrian Access Ramp. Concrete Curb and Gutter. Question Deadline 08/18/2023 at 3:00 PM MT Via U3P

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.