Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

September 25, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Multiple Locations, Normal, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Overlay an approximate 4050 linear foot segment of the Constitution Trail from N. Towanda Avenue to Boulder Drive by paving a second layer over the existing asphalt trail surface. Actual start and end locations are marked on the trail surface for bidding and construction purposes. The Scope of Work for this project is as follows. 1. Town staff have identified areas of which significant and extensive asphalt deterioration and breakdown exist. These areas will require a 1 1/2 inch milling to remove the existing asphalt. An aggregate asphalt 1 1/2 inch binder layer would then be added. 2. Three manholes exist on the trail surface. One and one-half inch steel riser rings or paving rings will be required. All headers and butt joints must meet the existing asphalt surface. 3. After the binder layer areas have been completed, install an overlay surface layer over the entire trail. SS-1H tack coat will be applied at a rate of .10 gallons per squareyard and properly cured prior to overlay. Overlay shall be at a depth of 1.5 inches (0.125 ft.) and consist of Hot Mix Asphalt Surface Course, Mix C, N50. 4. Contractor instructions: Project Description: Asphalt overlay an approximate 4050 linear foot segment of the Constitution Trail from N. Towanda Avenue to Boulder Drive. The Town of Normal reserves the right to reject any or all bids received. All written questions may be submitted Thursday, August 10, 2023, and continuing through Monday, August 21, 2023. Contract award Tuesday, September 5, 2023

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.