Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

October 2, 2023

November 15, 2023

Warwick Dr

Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Warwick Dr, Sheffield Lake, OH

Our team is requesting plans for this project.

Subscribe to View Full Documents

project consists of asphalt and concrete pavement milling, asphalt roadway rehabilitation, curb replacement, sidewalk and curb ramp replacement, pavement marking, signage, casting adjustments, drive repairs, lawn restoration and maintenance of traffic. Bid Security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said Surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. Cost of Plans and Contract Documents are $75. The City reserves the right to reject any and all bids and to waive any informalities or irregularities therein. Bidders must comply with the prevailing wage rates on Public Improvements in Lorain County and the City of Sheffield Lake, Ohio as determined by the Ohio Department of Commerce, Bureau of Wage and Hour Administration, (614) 644-2239. If the City determines to award the contract, the City will award it based on the lowest and best bid as determined in the discretion of the City The owner prefers all paving work be completed by November 15th, 2023 however the project shall be completed by no later than June 7th 2024.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.