Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

October 11, 2023

March 9, 2024

To Be Determined

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

To Be Determined, Bayfield, CO

Subscribe to View Full Documents

The project generally consists of the following: Removal of approximately 330 square yards of sidewalk/curb ramps and 840 linear feet of curb and gutter. Installation of approximately 510 square yards of concrete sidewalk; 620 linear feet of curb and gutter; 150 square yards of curb ramps; 425 square feet of large block gravity retaining wall; pedestrian handrails; asphalt and concrete pavement replacement; and pavement markings. All technical questions should be directed in writing to Catherine Carella, SGM, 555 Rivergate Lane Suite B4-82, Durango, CO 81301 (catherinec@sgm-inc.com) Question Deadline 08/28/2023 at 5:00 PM MT Questions regarding bids should be submitted to Catherine Carella, Design Engineer, at email CatherineC@sgm-inc.com

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects