Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

September 30, 2023

December 1, 2023

To Be Determined

Paving, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

To Be Determined, Catlin, IL

Subscribe to View Full Documents

Site Directions: 198 Seminary St #100, Catlin, IL 61817 The Project includes the following Work: Construction of a 0.25-mile concrete trail within the Village of Catlins Butler Point Park. Minor clearing and grading along with drain tile work will be required for construction of the project. The trail will be a 10 concrete path fully ADA compliant. Along the path, ten exercise stations will be installed and a no mow seed mix will be planted in the open space of the park. A small asphalt parking lot is also included in the scope of work. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bid security is not required.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.