Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2023

October 12, 2023

February 1, 2024

Whittier Blvd & S Eastern Ave

Site Work

No Information to Display

$1,138,656.00

Public - County

img_map_placeholder

Whittier Blvd & S Eastern Ave, East Los Angeles, CA

Subscribe to View Full Documents

Sealed bids will be accepted by Los Angeles County Public Works, Project Management Division III, for the installation and modification of new and existing traffic signals, reconstruction of curb, gutter, and curb ramps, and the performance of other appurtenant work under Project ID No. TDS0001706, East Los Angeles Traffic Signal Safety Project Phase I, in the unincorporated community of East Los Angeles. The work shall be done in accordance with the Plans and Specifications on file and open for inspection at Public Works. The work is estimated to cost between $875,000 and $1,325,000 and shall be completed in 80 working days. The prime contractor shall possess a valid California Class A and C10 contractor's license. Prebid questions regarding the Plans and Specifications shall be submitted via email only to: Mr. Amr Mabrouk at Amabrouk@dpw.lacounty.gov. Pre bid questions will not be accepted after 5 p.m. on Monday, September 4, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Each bid must be accompanied by a surety bond payable to County of Los Angeles in an amount equal to at least 10 percent of the bid to guarantee that the bidder will enter into the contract if it is so awarded. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All persons performing the work shall be paid not less than the General Prevailing Wage Determination prepared by the Director of Industrial Relations pursuant to the State Labor Code. Copies of these wage rates are available at Public Works. Furthermore, minimum Davis-Bacon Act Wage Determinations for this project as predetermined by the Secretary of Labor (Federal) are set forth in the Special Provisions.If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the applicable prevailing wage rates per the Director of Industrial Relations for similar classifications of labor, the contractor and its subcontractors shall pay not less than the higher wage rate. The rate of compensation for any classification not listed in the schedule, but which may be required to execute the contract, shall be commensurate and in accordance with the rates specified for similar or comparable classifications or for those performing similar or comparable duties. The Disadvantaged Business Enterprise (DBE) goal for this contract is 15 percent.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.