Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 8, 2023

October 9, 2023

December 31, 2024

7779 Troy Rd

Renovation

No Information to Display

$750,000.00

Public - City

img_map_placeholder

7779 Troy Rd, North Hampton, OH

Subscribe to View Full Documents

The work for which proposals are invited consists of construction of a 100,000 gallon elevated water storage tank along with approximately 225' of waterline connecting the existing system with the new tank. The Contract Documents including Specifications may be examined or obtained from the Issuing Office of the Consulting Engineer, Mote & Associates, Inc., 214 West Fourth Street, Greenville, Ohio 45331 (937.548.7511). The Owner and/or Engineer will not be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Engineer. Proposals will only be accepted from bidders who have purchased the Contract Documents from Mote & Associates, Inc. and are registered as a planholder. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each Proposal must contain the full name of the party or parties submitting the Proposal and all persons interested therein. Each bidder must submit evidence of its experiences on the projects of similar size and complexity, and a complete listing of all subcontractors to be used. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of this project. Additionally, Contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123 is required. The Village of North Hampton reserves the right to accept or reject any or all proposals, to waive any informalities in the bidding, and to enter into a contract with the bidder whom in their consideration offered the lowest and best proposal. All questions must be received no later than September 4, 2023 by 12PM.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects