Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

December 24, 2023

Lake Terrace Dr

Site Work

No Information to Display

$270,000.00

Public - City

img_map_placeholder

Lake Terrace Dr, Boulder City, NV

Subscribe to View Full Documents

Question Cutoff Date: 8/17/2023 03:00 PM (ET) All questions relative to this project prior to the opening of bids shall be completed utilizing the Nevada Government eMarketplace (NGEM) question portal. Description of Work: This work shall include furnishing all labor, material and equipment to complete the project Water Service Replacements - Lake Terrace as described in the specifications and shown in the plans. Work includes removals of existing 3/4, 1, 1-1/2 and 2 water services, relocation of existing service lines as needed to attain 4 separation between water and sewer laterals and make the service line perpendicular to the water main, connection to existing or relocated corporation stop at the main with a brass adapter, and installation of new copper water service (size to match existing) from the main to the meter for 36 water services within Boulder City. This work shall also include installation or replacement of water meters, meter boxes, and/or Encoder Receiver Transmitter modules (ERTs) for locations specified (these items will be supplied by the City). This project shall include asphalt replacements. Workman's Compensation Insurance, Faithful Performance Bond in the amount of one hundred percent (100%) of the total bid price, a Labor and Material Bond in the amount of one hundred percent (100%) of the total bid price, and a Guarantee Bond will be executed as part of the contract agreement. The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner. All work including deficiency list items must be completed within ninety (90) calendar days after the date of the Notice to Proceed by the Owner. The Contractor shall provide a one-year warranty for the scope of work performed in this contract. The one-year warranty shall be from the date of the Notice of Completion. Engineer's Estimate of Probable Cost: $234,000 - $270,000

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.