Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 26, 2024

No Information to Display

To Be Determined

Site Work

No Information to Display

$565,000.00

Public - City

img_map_placeholder

To Be Determined, Shelbyville, TN

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This RFQ is for engineering only and is requesting engineering firms to submit statement of qualifications. There will not be a bid package or addenda’s for construction at this point. Notice Content INVITATION TO SUBMIT STATEMENTS OF QUALIFICATIONS Copper Basin Utility District is seeking statements of qualifications from engineering firms for a Tennessee Department of Environment and Conservation Division of Water Resources- American Rescue Plan Collaborative Grants-State Water Infrastructure Grants Program project, specifically for the design and construction inspection of a Water Loss Improvements Project. Specifically, the selected engineering firm will perform design phase activities from Summer 2023 until Winter 2024 (allowing for approved extensions and necessary follow-up after said time period), Bid Phase Activities from Winter 2024 until Fall 2025 (allowing for approved extensions and necessary follow-up after said time period), and Construction Inspection activities from Fall 2024 until Fall 2025 or until the project is complete. The Statement of Qualifications should include the following: 1) Representative listing of recent projects and clients in subject field. 2) Listing of all funded grant projects, including CDBG and other utility grants filed in the past three years with status noted. 3) Availability of staff to do preliminary engineering design immediately. 4) Resumes of key personnel expected to be involved in the project.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects