Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

October 30, 2023

October 30, 2027

2350 NY-110

Renovation

No Information to Display

$53,134,000.00

Public - State/Provincial

img_map_placeholder

2350 NY-110, Farmingdale, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

261049-00 Rehabilitate Sinclair Hall The scope of the Project includes renovation of Sinclair Hall, a 43,171 GSF, two-story, concrete and masonry building. A new approximately 30'x80' building addition will be located on the north face of the existing building. The exterior renovation will include masonry repair & repointing, rainscreen panels and replacement of all glazing. The interior renovation includes abatement, new interior finishes, modifications to stair and floor openings, in-fill of existing pit and slab depression, plumbing, sprinklers, fire alarm and IT/telecom provisions. The HVAC systems will be completely replaced and will include dedicated outdoor air units, fan coil units, air handling units and ground source heat pumps with an associated well field. 26X325-01 Center for Computer Science and Information Technology Systems The scope of the Project includes construction of approximately 50,000 gross square foot new building to house the academic Division of Computing as well as modernized classrooms, a student collaboration space, and innovation computer labs. The building will also include space for regional business engagement and for workforce IT training for Long Island. The project will meet SUNY's energy and carbon reduction goals and the 2020 New York State's Climate Leadership and Community Protection Act. There will be one CM Contract awarded which will service both aforementioned projects. all inquiries regarding this procurement can only be made to: Samantha Lord, Jeremy Clausi, Doreen Bottieri, Scott Clay (M/WBE SDVOB Issues Only) Questions regarding this opportunity should be emailed to SUCF.ConsultantProcurement@suny.edu. The deadline to submit questions is Friday, August 18, 2023. The current estimated construction value for the 261049-00 and 26x325 projects is approximately $29,000,000 and $53,134,000; respectively. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 48 Months *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

70 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects