Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2025

January 22, 2024

June 30, 2024

375 Airport Dr

Paving, Site Work

No Information to Display

$80,000,000.00

Public - State/Provincial

img_map_placeholder

375 Airport Dr, Worcester, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Question Deadline 08/24/2023 at 12:00 PM ET Questions may be sent via email to CPBidQuestions@massport.com Estimated project cost: $8 million. This RFQ includes specific scope for the following 4 projects: (1) Replace Runway 29 Departure EMAS (R/W 11 End), (2) Replace Runway 11 Departure EMAS (R/W 29 End), (3) Construct Replacement Taxiway F from Runway 11-29 to the Taxiway D intersection with Boundary Marking Modifications at the Terminal Ramp, and (4) Rehabilitate the Entrance and Exit passenger roadway to the Terminal. The Supplemental Information Package will provide detailed information about Scope of Work, Selection Criteria and Submission Requirements. The Authority is seeking qualified multidiscipline consulting firm or team, with proven experience to provide professional engineering services for planning, design, and construction, including resident inspection for its airfield capital improvement projects. The Consultant must be able to work closely with the Authority and other interested parties in order to provide such services in a timely and effective manner. Included with this scope would be the replacement of the existing yellow delineators that project the perimeter to the bed and all of the characteristics of the EMAS products such as the latest generation blocks, seam seal, and deflector shield.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.