Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

March 1, 2024

No Information to Display

Paul Lake Rd

Site Work

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

Paul Lake Rd, Kamloops, BC

Subscribe to View Full Documents

To improve the existing spillway capacity requires construction of an opening across the full width of the existing dam crest, which when combined with the existing CMP spillway culverts will be able to flow the upgraded spillway flow required by the new Dam Safety Regulations, basically a concrete bridge or a box culvert structure which will carry full highway traffic loading as the dam provides an embankment whose crest serves as part of a Provincial Highway which has to be kept continuously open for public vehicle and pedestrian traffic. To be able to maintain traffic, construction of the additional spillway capacity necessitates doing the work in five stages. Documents can be obtained from www.bcbid.gov.bc.ca The project will be delayed and re-tendered next year.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.