Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

November 1, 2023

November 14, 2025

US-7

Demolition, New Construction, Paving, Site Work

No Information to Display

$10,000,000.00

Public - State/Provincial

img_map_placeholder

US-7, Pittsford, VT

Subscribe to View Full Documents

Work to be performed includes full replacement of existing bridge 108, approach work on US Route 7, realigning of VT Route 3 and Oxbow Road, and related channel work. Location: Beginning in the Town of Pittsford on Us Route 7 Approximately 385 Ft South of the Intersection of Us Route 7/vt Route 3 and Extending Approximately 653 Ft to the North. Bid Bond: Electronic Bid Bond to Be Submitted in the Amount of 5% of the Contractor's Bid All Bidders on This Project Must Hold Both Current Annual Prequalification With the Vermont Agency of Transportation Through the Contractor's Experience Questionnaire and Financial Statement And Unconditioned Project-specific Approval Through the "Standard Form - Request for Proposal" Ca-82 Form During the advertisement period, all questions shall be addressed solely to the Office of Contract Administration via email: AOT.ConstructionContractingInquiry@vermont.gov This Contract shall be completed on or before November 14, 2025. The right is reserved to reject any or all bids, to waive any formality, and any and all technicalities in bids, and to accept such bids as may be deemed in the best interest of the awarding agency. VT DOT - Replacement of Existing Bridge 108 Contract Name: PITTSFORD BF 019-3(59)

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.